Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Tobacco and Food Processing Machinery
NAICS
n/a
SIC 3556: Food Products Machinery
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 87,000
ft2
Annual Production 360
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,962 1,167,351
kWh
Natural Gas $26,925 5,020
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,454 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,807

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $41,283 $67,113 $41,283
560,961
kWh
-
02 2.7261: Install timers and/or thermostats $6,341 $1,560 - $6,341
-
MMBtu
03 2.7261: Install timers and/or thermostats $2,461 $1,365 $172
2,345
kWh
$2,289
-
MMBtu
04 2.4133: Use most efficient type of electric motors $245 $272 $245
3,224
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $387 $292 $387
5,275
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $676 $500 $676
9,086
kWh
-
07 2.1223: Install smaller boiler (increase high fire duty cycle) $1,061 $610 - $1,061
-
MMBtu
TOTAL RECOMMENDED $52,454 $71,712 $42,763
580,891
kWh
$9,691
-
MMBtu
TOTAL IMPLEMENTED $44,807 $69,270 $42,518
577,667
kWh
$2,289
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs