ITAC Assessment: OD0021
ITAC logo
ITAC Assessment: OD0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Armored & power cables
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 320,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $316,064 5,098,183
kWh
Natural Gas $46,152 8,646
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,011 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,496

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $24,805 $60,851 $24,805
400,059
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $12,122 $14,360 $12,122
195,487
kWh
-
03 2.4322: Use or replace with energy efficient substitutes $1,350 $880 $1,350
21,688
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,240 $800 $1,240
19,930
kWh
-
05 2.4133: Use most efficient type of electric motors $981 $1,736 $981
15,826
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $343 $786 $343
5,569
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $470 $200 - $470
-
MMBtu
08 2.7261: Install timers and/or thermostats $10,700 $1,758 - $10,700
-
MMBtu
TOTAL RECOMMENDED $52,011 $81,371 $40,841
658,559
kWh
$11,170
-
MMBtu
TOTAL IMPLEMENTED $27,496 $63,587 $27,026
435,815
kWh
$470
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs