Assessment Year | 1995 |
---|---|
Principal Product | Armored & power cables |
NAICS |
n/a
|
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
320,000
ft2
|
Annual Production | 20,000,000
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $316,064 | 5,098,183 |
kWh
|
$0.062 |
Natural Gas | $46,152 | 8,646 |
MMBtu
|
$5.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,011 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,496 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,805 | $60,851 |
$24,805
400,059
kWh
|
- | |
02 | 2.4239: Eliminate or reduce compressed air usage | $12,122 | $14,360 |
$12,122
195,487
kWh
|
- | |
03 | 2.4322: Use or replace with energy efficient substitutes | $1,350 | $880 |
$1,350
21,688
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,240 | $800 |
$1,240
19,930
kWh
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $981 | $1,736 |
$981
15,826
kWh
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $343 | $786 |
$343
5,569
kWh
|
- | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $470 | $200 | - |
$470
-
MMBtu
|
|
08 | 2.7261: Install timers and/or thermostats | $10,700 | $1,758 | - |
$10,700
-
MMBtu
|
|
TOTAL RECOMMENDED | $52,011 | $81,371 |
$40,841
658,559
kWh
|
$11,170
-
MMBtu
|
||
TOTAL IMPLEMENTED | $27,496 | $63,587 |
$27,026
435,815
kWh
|
$470
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs