ITAC Assessment: OD0013
ITAC logo
ITAC Assessment: OD0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Plastic Strapping
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 80,000
ft2
Annual Production 11,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $297,391 7,143,025
kWh
Natural Gas $2,100 285
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,490

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,766 $15,710 $6,766
162,368
kWh
02 2.4239: Eliminate or reduce compressed air usage $5,441 $3,000 $5,441
130,715
kWh
03 2.4133: Use most efficient type of electric motors $4,776 $8,261 $4,776
114,889
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,197 $3,440 $3,197
76,788
kWh
05 2.6231: Utilize controls to operate equipment only when needed $4,076 $140 $4,076
97,890
kWh
06 2.6231: Utilize controls to operate equipment only when needed $1,814 $860 $1,814
43,669
kWh
TOTAL RECOMMENDED $26,070 $31,411 $26,070
626,319
kWh
TOTAL IMPLEMENTED $17,490 $14,841 $17,490
420,282
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs