ITAC Assessment: OD0005
ITAC logo
ITAC Assessment: OD0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product chain saws & outdoor power equipment
NAICS
n/a
SIC 3546: Power-Driven Handtools
Sales Range $100
M
to 500
M
# of Employees 600
Plant Area 500,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 8,232
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $691,086 13,143,025
kWh
Natural Gas $57,834 9,785
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,530 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,122

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $943 $336 $943
18,171
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $692 $302 $692
13,189
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,191 $16,710 $8,191
155,920
kWh
-
04 2.2525: Eliminate cooling of process streams which subsequently must be heated and vice versa $20,090 $3,677 $20,090
381,887
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,595 $5,698 $4,595
92,907
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $179 $97 $179
3,517
kWh
-
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,793 $5,589 $8,737
166,178
kWh
$(-3,944.0)
-
MMBtu
08 2.4133: Use most efficient type of electric motors $2,047 $3,810 $2,047
38,980
kWh
-
TOTAL RECOMMENDED $41,530 $36,219 $45,474
870,749
kWh
$(-3,944.0)
-
MMBtu
TOTAL IMPLEMENTED $1,122 $433 $1,122
21,688
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs