| Assessment Year | 1994 |
|---|---|
| Principal Product | Converted paper products |
| NAICS |
n/a
|
| SIC | 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 115 |
| Plant Area |
152,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,168
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $92,163 | 1,052,169 |
kWh
|
$0.088 |
| Natural Gas | $71,658 | 23,652 |
MMBtu
|
$3.03 |
| LPG | $3,563 | 265 |
MMBtu
|
$13.45 |
| Fuel Oil #2 | $8,398 | 2,106 |
MMBtu
|
$3.99 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $13,638 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,666 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $1,054 | $633 | - |
$1,054
-
MMBtu
|
|
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $345 | $200 | - |
$345
-
MMBtu
|
|
| 03 | 2.6242: Minimize operation of equipment maintained in standby condition | $2,303 | - | - |
$2,303
-
MMBtu
|
|
| 04 | 2.4221: Install compressor air intakes in coolest locations | $426 | $600 |
$426
4,982
kWh
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,155 | $800 |
$1,155
13,189
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,686 | $2,315 |
$7,686
87,632
kWh
|
- | |
| 07 | 2.2113: Repair or replace steam traps | $669 | $400 | - |
$669
-
MMBtu
|
|
| TOTAL RECOMMENDED | $13,638 | $4,948 |
$9,267
105,803
kWh
|
$4,371
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $10,666 | $4,548 |
$9,267
105,803
kWh
|
$1,399
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs