ITAC Assessment: OD0001
ITAC logo
ITAC Assessment: OD0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Converted paper products
NAICS
n/a
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 152,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,168
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,163 1,052,169
kWh
Natural Gas $71,658 23,652
MMBtu
LPG $3,563 265
MMBtu
Fuel Oil #2 $8,398 2,106
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,638 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,666

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $1,054 $633 - $1,054
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $345 $200 - $345
-
MMBtu
03 2.6242: Minimize operation of equipment maintained in standby condition $2,303 - - $2,303
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $426 $600 $426
4,982
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,155 $800 $1,155
13,189
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,686 $2,315 $7,686
87,632
kWh
-
07 2.2113: Repair or replace steam traps $669 $400 - $669
-
MMBtu
TOTAL RECOMMENDED $13,638 $4,948 $9,267
105,803
kWh
$4,371
-
MMBtu
TOTAL IMPLEMENTED $10,666 $4,548 $9,267
105,803
kWh
$1,399
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs