ITAC Assessment: NV0164
ITAC logo
ITAC Assessment: NV0164
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product industrial inorganic chemicals
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 114
Plant Area 94,500
ft2
Annual Production 250,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $854,367 23,323,000
kWh
Electricity Demand $137,484 36,528
kW-mo/yr
Electricity Fees $3,244 -
Natural Gas $2,302,564 613,139
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $349,824 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $95,346 $200 n/a $83,592
2,281,946
kWh
$11,754
-
kW-mo/yr
- - -
02 2.1113: Reduce combustion air flow to optimum $75,664 $100 n/a - - $75,664
-
MMBtu
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $21,258 - n/a $18,637
403,283
kWh
$2,621
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $4,704 $150 n/a $4,203
114,596
kWh
$501
-
kW-mo/yr
- - -
05 4.426: Modify workload $8,134 - n/a - - - $8,134 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $137,083 $45,279 n/a $187
2,931
kWh
- - $136,896 -
07 3.4151: Minimize water usage $6,651 $432 n/a - - - - $6,651
-
Tgal
08 3.4154: Eliminate leaks in water lines and valves $984 $100 n/a - - - - $984
-
Tgal
TOTAL RECOMMENDED $349,824 $46,261 $106,619
2,802,756
kWh
$14,876
-
kW-mo/yr
$75,664
-
MMBtu
$145,030 $7,635
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs