ITAC Assessment: NV0162
ITAC logo
ITAC Assessment: NV0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Wood Partitions and Fixtures
NAICS
n/a
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $5
M
to 10
M
# of Employees 18
Plant Area 21,000
ft2
Annual Production 64,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,043 327,667
kWh
Electricity Demand $9,427 1,272
kW-mo/yr
Electricity Fees $2,676 -
Natural Gas $3,413 358
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,762 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,415 $600 n/a $9,415
52,755
kWh
-
02 2.4226: Use / purchase optimum sized compressor $6,510 $8,300 n/a $6,510
35,463
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,065 - n/a $2,065
11,430
kWh
-
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,772 - n/a - $6,772
-
lb
TOTAL RECOMMENDED $24,762 $8,900 $17,990
99,648
kWh
$6,772
-
lb
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs