ITAC Assessment: NV0154
ITAC logo
ITAC Assessment: NV0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Commercial Printing
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 5,100
ton
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,620 2,240,621
kWh
Electricity Demand $11,521 839
kW-mo/yr
Electricity Fees $(-16,865.0) -
Natural Gas $17,849 2,693
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,379 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $700 $100 n/a $686
7,327
kWh
- $14 -
02 2.6231: Utilize controls to operate equipment only when needed $1,139 $370 n/a $1,262
13,189
kWh
- $(-123.0) -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,943 $6,800 n/a $3,034
32,825
kWh
$189
-
kW-mo/yr
$(-280.0) -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $16,090 $24,980 n/a $17,836
187,573
kWh
- $(-1,746.0) -
05 2.8114: Change rate schedules or other changes in utility service $9,857 $1,060 n/a - - $9,857 -
06 4.445: Install equipment to move product $3,650 $560 n/a - - - $3,650
TOTAL RECOMMENDED $34,379 $33,870 $22,818
240,914
kWh
$189
-
kW-mo/yr
$7,722 $3,650
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs