ITAC Assessment: NV0136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Computer Storage Devices
NAICS
n/a
SIC 3572: Computer Storage Devices
Sales Range $50
M
to 100
M
# of Employees 130
Plant Area 120,000
ft2
Annual Production 50,250,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,982 2,748,535
kWh
Electricity Demand $53,116 6,518
kW-mo/yr
Electricity Fees $16,131 -
Natural Gas $28,699 4,552
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,561 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,016

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4226: Use / purchase optimum sized compressor $3,174 $1,500 $1,465
31,653
kWh
$1,482
-
kW-mo/yr
$227 - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,742 $900 $1,989
42,790
kWh
$1,485
-
kW-mo/yr
$268 - -
03 2.7241: Install outside air damper / economizer on hvac unit $10,471 $15,285 $7,846
168,523
kWh
$1,860
-
kW-mo/yr
$765 - -
04 2.8114: Change rate schedules or other changes in utility service $274 - - - - - $274
05 3.5212: Regrind, reuse, or sell scrap plastic parts $900 - - - - $900
-
lb
-
TOTAL RECOMMENDED $18,561 $17,685 $11,300
242,966
kWh
$4,827
-
kW-mo/yr
$1,260 $900
-
lb
$274
TOTAL IMPLEMENTED $4,016 $900 $1,989
42,790
kWh
$1,485
-
kW-mo/yr
$268 - $274
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs