ITAC Assessment: MS0124
ITAC logo
ITAC Assessment: MS0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Electric Trolling Motors
NAICS
n/a
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 100,000
ft2
Annual Production 225,000
pieces
Production Hrs. Annual 2,100
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,205 1,304,514
kWh
Electricity Demand $40,148 4,666
kW-mo/yr
Electricity Fees $1,351 -
Natural Gas $18,880 3,472
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,549 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,798

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,313 $15,976 $2,234
67,409
kWh
$3,986
-
kW-mo/yr
$93 - -
02 2.7261: Install timers and/or thermostats $2,507 $944 $2,470
74,443
kWh
- $37 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $740 $400 $729
21,981
kWh
- $11 - -
04 4.515: Install shelves / racks to utilize unused space $4,500 $2,888 - - - - $4,500
05 4.322: Eliminate old stock and modify inventory control $35,438 $25,290 - - - $35,438 -
06 2.8114: Change rate schedules or other changes in utility service $51 $14 - - - - $51
TOTAL RECOMMENDED $49,549 $45,512 $5,433
163,833
kWh
$3,986
-
kW-mo/yr
$141 $35,438 $4,551
TOTAL IMPLEMENTED $7,798 $4,246 $3,199
96,424
kWh
- $48 - $4,551
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs