Assessment Year | 1999 |
---|---|
Principal Product | Steel Joist |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 320 |
Plant Area |
137,500
ft2
|
Annual Production | 40,000
ton
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $146,478 | 3,425,850 |
kWh
|
$0.043 |
Electricity Demand | $61,197 | 7,625 |
kW-mo/yr
|
$8.03 |
Electricity Fees | $6,113 | - |
|
- |
Natural Gas | $66,103 | 11,206 |
MMBtu
|
$5.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $65,559 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $855 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $5,222 | $5,533 |
$3,239
52,462
kWh
|
- | $1,983 | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,525 | $344 |
$1,010
23,740
kWh
|
$515
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $855 | $150 |
$534
12,603
kWh
|
$321
-
kW-mo/yr
|
- | - | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $18,506 | - |
$18,506
432,884
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $25,801 | $62,350 |
$18,958
443,435
kWh
|
$6,843
-
kW-mo/yr
|
- | - | |
06 | 4.122: Develop standard procedures to improve internal yields | $13,650 | $20,000 | - | - | - | $13,650 | |
TOTAL RECOMMENDED | $65,559 | $88,377 |
$42,247
965,124
kWh
|
$7,679
-
kW-mo/yr
|
$1,983 | $13,650 | ||
TOTAL IMPLEMENTED | $855 | $150 |
$534
12,603
kWh
|
$321
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs