ITAC Assessment: NV0134
ITAC logo
ITAC Assessment: NV0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Steel Joist
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 320
Plant Area 137,500
ft2
Annual Production 40,000
ton
Production Hrs. Annual 4,420
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,478 3,425,850
kWh
Electricity Demand $61,197 7,625
kW-mo/yr
Electricity Fees $6,113 -
Natural Gas $66,103 11,206
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,559 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $855

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.3212: Optimize plant power factor $5,222 $5,533 $3,239
52,462
kWh
- $1,983 -
02 2.4221: Install compressor air intakes in coolest locations $1,525 $344 $1,010
23,740
kWh
$515
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $855 $150 $534
12,603
kWh
$321
-
kW-mo/yr
- -
04 2.6212: Turn off equipment during breaks, reduce operating time $18,506 - $18,506
432,884
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $25,801 $62,350 $18,958
443,435
kWh
$6,843
-
kW-mo/yr
- -
06 4.122: Develop standard procedures to improve internal yields $13,650 $20,000 - - - $13,650
TOTAL RECOMMENDED $65,559 $88,377 $42,247
965,124
kWh
$7,679
-
kW-mo/yr
$1,983 $13,650
TOTAL IMPLEMENTED $855 $150 $534
12,603
kWh
$321
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs