ITAC Assessment: NV0129
ITAC logo
ITAC Assessment: NV0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Bulkhead & Reducer Fittings
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 9,000
ft2
Annual Production 483,200
pieces
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,855 330,598
kWh
Electricity Demand $5,285 611
kW-mo/yr
Electricity Fees $2,991 -
Natural Gas $4,936 632
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,442 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,044

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4221: Install compressor air intakes in coolest locations $154 $225 $163
1,172
kWh
$(-9.0) - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $230 - $243
1,758
kWh
$(-13.0) - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,578 $6,112 $2,727
25,791
kWh
$(-149.0) - -
04 2.7231: Use radiant heater for spot heating $485 $1,149 - - $485
-
MMBtu
-
05 2.7243: Improve air circulation with destratification fans / other methods $660 $400 $(-85.0)
(-586)
kWh
- $745
-
MMBtu
-
06 3.5212: Regrind, reuse, or sell scrap plastic parts $335 - - - - $335
-
lb
TOTAL RECOMMENDED $4,442 $7,886 $3,048
28,135
kWh
$(-171.0) $1,230
-
MMBtu
$335
-
lb
TOTAL IMPLEMENTED $1,044 $625 $321
2,344
kWh
$(-22.0) $745
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs