Assessment Year | 1999 |
---|---|
Principal Product | Bulkhead & Reducer Fittings |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $1 M to 5M |
# of Employees | 45 |
Plant Area |
9,000
ft2
|
Annual Production | 483,200
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $34,855 | 330,598 |
kWh
|
$0.11 |
Electricity Demand | $5,285 | 611 |
kW-mo/yr
|
$8.65 |
Electricity Fees | $2,991 | - |
|
- |
Natural Gas | $4,936 | 632 |
MMBtu
|
$7.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,442 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,044 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $154 | $225 |
$163
1,172
kWh
|
$(-9.0) | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $230 | - |
$243
1,758
kWh
|
$(-13.0) | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,578 | $6,112 |
$2,727
25,791
kWh
|
$(-149.0) | - | - | |
04 | 2.7231: Use radiant heater for spot heating | $485 | $1,149 | - | - |
$485
-
MMBtu
|
- | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $660 | $400 |
$(-85.0)
(-586)
kWh
|
- |
$745
-
MMBtu
|
- | |
06 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $335 | - | - | - | - |
$335
-
lb
|
|
TOTAL RECOMMENDED | $4,442 | $7,886 |
$3,048
28,135
kWh
|
$(-171.0) |
$1,230
-
MMBtu
|
$335
-
lb
|
||
TOTAL IMPLEMENTED | $1,044 | $625 |
$321
2,344
kWh
|
$(-22.0) |
$745
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs