ITAC Assessment: NV0124
ITAC logo
ITAC Assessment: NV0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Fluid Power Valves
NAICS
n/a
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $5
M
to 10
M
# of Employees 62
Plant Area 38,000
ft2
Annual Production 24,016
pieces
Production Hrs. Annual 6,084
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,218 532,532
kWh
Electricity Demand $16,583 1,787
kW-mo/yr
Electricity Fees $600 -
Natural Gas $2,521 362
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $101,373 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $97,006

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Increase in Production Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,858 $7,243 $3,916
93,787
kWh
$1,359
-
kW-mo/yr
$(-1,417.0)
-
MMBtu
- -
02 2.2511: Insulate bare equipment $1,150 $800 $1,150
15,533
kWh
- - - -
03 2.4221: Install compressor air intakes in coolest locations $292 $135 $155
3,810
kWh
$137
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,617 $8,520 $1,819
43,669
kWh
$798
-
kW-mo/yr
- - -
05 3.1191: Change procedures / equipment / operating conditions $308 $175 - - - $308
-
lb
-
06 4.422: Utilize outside contracting $93,148 - - - - - $93,148
TOTAL RECOMMENDED $101,373 $16,873 $7,040
156,799
kWh
$2,294
-
kW-mo/yr
$(-1,417.0)
-
MMBtu
$308
-
lb
$93,148
TOTAL IMPLEMENTED $97,006 $7,243 $3,916
93,787
kWh
$1,359
-
kW-mo/yr
$(-1,417.0)
-
MMBtu
- $93,148
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs