ITAC Assessment: NV0119
ITAC logo
ITAC Assessment: NV0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Liquid Sodium Cyanide
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 28
Plant Area 16,700
ft2
Annual Production 60,000,000
ton
Production Hrs. Annual 8,064
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $400,968 9,488,277
kWh
Electricity Demand $136,030 16,961
kW-mo/yr
Electricity Fees $7,360 -
Natural Gas $1,788,061 679,923
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,567 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,383

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $60,884 $48,211 $52,652
1,245,897
kWh
$8,538
-
kW-mo/yr
$(-306.0)
02 2.4221: Install compressor air intakes in coolest locations $928 $252 $802
19,050
kWh
$130
-
kW-mo/yr
$(-4.0)
03 2.7124: Make a practice of turning off lights when not needed $2,499 - $2,160
50,996
kWh
$352
-
kW-mo/yr
$(-13.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,256 $4,009 $1,087
25,791
kWh
$176
-
kW-mo/yr
$(-7.0)
TOTAL RECOMMENDED $65,567 $52,472 $56,701
1,341,734
kWh
$9,196
-
kW-mo/yr
$(-330.0)
TOTAL IMPLEMENTED $63,383 $48,211 $54,812
1,296,893
kWh
$8,890
-
kW-mo/yr
$(-319.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs