ITAC Assessment: NV0118
ITAC logo
ITAC Assessment: NV0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Unsupported Plastic Film and Sheet
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 27,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,957 2,365,475
kWh
Electricity Demand $39,037 4,010
kW-mo/yr
Electricity Fees $5,593 -
Natural Gas $1,232 222
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,539 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,698

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $2,663 $3,333 - - $2,663 - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $331 $180 $275
6,741
kWh
$50
-
kW-mo/yr
$6 - -
03 2.4221: Install compressor air intakes in coolest locations $1,687 $56 $1,397
33,705
kWh
$257
-
kW-mo/yr
$33 - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,324 - $1,097
26,377
kWh
$201
-
kW-mo/yr
$26 - -
05 2.8114: Change rate schedules or other changes in utility service $2,870 - - - $2,870 - -
06 3.1191: Change procedures / equipment / operating conditions $1,834 $3,260 - - - - $1,834
07 3.6192: Use a less expensive method of waste removal $1,830 - - - - $1,830 -
TOTAL RECOMMENDED $12,539 $6,829 $2,769
66,823
kWh
$508
-
kW-mo/yr
$5,598 $1,830 $1,834
TOTAL IMPLEMENTED $7,698 $6,773 $275
6,741
kWh
$50
-
kW-mo/yr
$5,539 - $1,834
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs