ITAC Assessment: NV0109
ITAC logo
ITAC Assessment: NV0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Ready Mix Concrete
NAICS
n/a
SIC 3273: Ready-Mixed Concrete
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area
n/a
Annual Production 200,000
units
Production Hrs. Annual 4,623
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,514 191,676
kWh
Electricity Demand $18,514 1,937
kW-mo/yr
Electricity Fees $1,869 -
Natural Gas $31,240 6,026
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,516 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,823

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.1213: Direct warmest air to combustion intake $686 $550 - - - $686
-
MMBtu
- - - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,687 $1,076 $871
20,809
kWh
$782
-
kW-mo/yr
$34 - - - - - -
03 2.4133: Use most efficient type of electric motors $3,155 $4,348 $1,646
39,273
kWh
$1,447
-
kW-mo/yr
$62 - - - - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,204 - $1,370
32,825
kWh
$791
-
kW-mo/yr
$43 - - - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $349 $150 $84
2,052
kWh
$241
-
kW-mo/yr
$24 - - - - - -
06 2.4221: Install compressor air intakes in coolest locations $776 $157 $483
11,430
kWh
$278
-
kW-mo/yr
$15 - - - - - -
07 2.7124: Make a practice of turning off lights when not needed $353 - $225
5,275
kWh
$121
-
kW-mo/yr
$7 - - - - - -
08 4.112: Replace old machine with new automatic multi-station tool $6,552 $233 - - - - - - $6,552 - -
09 4.441: Install automatic packing equipment $15,147 $60,500 - - - - - - $15,147 - -
10 3.4154: Eliminate leaks in water lines and valves $120 $150 - - - - $120
-
Tgal
- - - -
11 3.5314: Use in-process recycling whenever possible $4,175 $40,550 - - - - - - - $4,175 -
12 3.5311: Recover and reuse waste material $35,819 $1,000 - - - - $2,981
-
Tgal
- $64,260 - $(-31,422.0)
13 3.5315: Lease / purchase baler; sell cardboard to recycler $1,493 - - - - - - $1,493
-
lb
- - -
TOTAL RECOMMENDED $72,516 $108,714 $4,679
111,664
kWh
$3,660
-
kW-mo/yr
$185 $686
-
MMBtu
$3,101
-
Tgal
$1,493
-
lb
$85,959 $4,175 $(-31,422.0)
TOTAL IMPLEMENTED $10,823 $6,431 $4,679
111,664
kWh
$3,660
-
kW-mo/yr
$185 $686
-
MMBtu
$120
-
Tgal
$1,493
-
lb
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs