Assessment Year | 1998 |
---|---|
Principal Product | Ready Mix Concrete |
NAICS |
n/a
|
SIC | 3273: Ready-Mixed Concrete |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
n/a
|
Annual Production | 200,000
units
|
Production Hrs. Annual | 4,623
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $8,514 | 191,676 |
kWh
|
$0.044 |
Electricity Demand | $18,514 | 1,937 |
kW-mo/yr
|
$9.56 |
Electricity Fees | $1,869 | - |
|
- |
Natural Gas | $31,240 | 6,026 |
MMBtu
|
$5.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $72,516 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,823 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1213: Direct warmest air to combustion intake | $686 | $550 | - | - | - |
$686
-
MMBtu
|
- | - | - | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,687 | $1,076 |
$871
20,809
kWh
|
$782
-
kW-mo/yr
|
$34 | - | - | - | - | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $3,155 | $4,348 |
$1,646
39,273
kWh
|
$1,447
-
kW-mo/yr
|
$62 | - | - | - | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,204 | - |
$1,370
32,825
kWh
|
$791
-
kW-mo/yr
|
$43 | - | - | - | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $349 | $150 |
$84
2,052
kWh
|
$241
-
kW-mo/yr
|
$24 | - | - | - | - | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $776 | $157 |
$483
11,430
kWh
|
$278
-
kW-mo/yr
|
$15 | - | - | - | - | - | - | |
07 | 2.7124: Make a practice of turning off lights when not needed | $353 | - |
$225
5,275
kWh
|
$121
-
kW-mo/yr
|
$7 | - | - | - | - | - | - | |
08 | 4.112: Replace old machine with new automatic multi-station tool | $6,552 | $233 | - | - | - | - | - | - | $6,552 | - | - | |
09 | 4.441: Install automatic packing equipment | $15,147 | $60,500 | - | - | - | - | - | - | $15,147 | - | - | |
10 | 3.4154: Eliminate leaks in water lines and valves | $120 | $150 | - | - | - | - |
$120
-
Tgal
|
- | - | - | - | |
11 | 3.5314: Use in-process recycling whenever possible | $4,175 | $40,550 | - | - | - | - | - | - | - | $4,175 | - | |
12 | 3.5311: Recover and reuse waste material | $35,819 | $1,000 | - | - | - | - |
$2,981
-
Tgal
|
- | $64,260 | - | $(-31,422.0) | |
13 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,493 | - | - | - | - | - | - |
$1,493
-
lb
|
- | - | - | |
TOTAL RECOMMENDED | $72,516 | $108,714 |
$4,679
111,664
kWh
|
$3,660
-
kW-mo/yr
|
$185 |
$686
-
MMBtu
|
$3,101
-
Tgal
|
$1,493
-
lb
|
$85,959 | $4,175 | $(-31,422.0) | ||
TOTAL IMPLEMENTED | $10,823 | $6,431 |
$4,679
111,664
kWh
|
$3,660
-
kW-mo/yr
|
$185 |
$686
-
MMBtu
|
$120
-
Tgal
|
$1,493
-
lb
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs