ITAC Assessment: NV0108
ITAC logo
ITAC Assessment: NV0108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Remanufactured Industrial Parts
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 25,000
ft2
Annual Production 38,000,000
units
Production Hrs. Annual 6,214
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,214 836,166
kWh
Electricity Demand $15,056 2,327
kW-mo/yr
Electricity Fees $5,219 -
Natural Gas $1,133 137
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,707 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,517

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 2.2511: Insulate bare equipment $1,042 $768 $776
13,189
kWh
$192
-
kW-mo/yr
$74 -
02 2.3522: Increase electrical conductor size to reduce distribution losses $11,472 $15,808 $7,079
120,164
kWh
$3,570
-
kW-mo/yr
$823 -
03 2.4231: Reduce the pressure of compressed air to the minimum required $259 - $192
3,224
kWh
$48
-
kW-mo/yr
$19 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,992 $350 $2,158
36,635
kWh
$1,549
-
kW-mo/yr
$285 -
05 2.4221: Install compressor air intakes in coolest locations $148 $252 $110
1,758
kWh
$28
-
kW-mo/yr
$10 -
06 3.5248: Separate and recycle scrap metal to foundry or for sale $794 $220 - - - $794
-
lb
TOTAL RECOMMENDED $17,707 $17,398 $10,315
174,970
kWh
$5,387
-
kW-mo/yr
$1,211 $794
-
lb
TOTAL IMPLEMENTED $16,517 $16,378 $9,429
160,023
kWh
$5,167
-
kW-mo/yr
$1,127 $794
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs