Assessment Year | 1998 |
---|---|
Principal Product | Slurry Valves and Feeders |
NAICS |
n/a
|
SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 105 |
Plant Area |
47,000
ft2
|
Annual Production | 7,330
pieces
|
Production Hrs. Annual | 6,266
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $59,354 | 1,422,333 |
kWh
|
$0.042 |
Electricity Demand | $35,032 | 3,775 |
kW-mo/yr
|
$9.28 |
Electricity Fees | $2,500 | - |
|
- |
Natural Gas | $26,330 | 5,073 |
MMBtu
|
$5.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,313 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,109 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1213: Direct warmest air to combustion intake | $388 | $210 | - | - | - |
$388
-
MMBtu
|
- | - | - | - | |
02 | 2.2515: Use optimum thickness insulation | $304 | $370 | - | - | - |
$304
-
MMBtu
|
- | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,070 | $13,450 |
$2,798
67,116
kWh
|
$1,192
-
kW-mo/yr
|
$80 | - | - | - | - | - | |
04 | 2.7261: Install timers and/or thermostats | $162 | - |
$114
2,638
kWh
|
$45
-
kW-mo/yr
|
$3 | - | - | - | - | - | |
05 | 3.1161: Eliminate/reduce an operation | $9,796 | - | - | - | - | - |
$9,796
-
gal
|
- | - | - | |
06 | 3.1191: Change procedures / equipment / operating conditions | $1,753 | $4,700 | - | - | - | - | - |
$1,753
-
lb
|
- | - | |
07 | 3.4116: Meter recycled water (to reduce sewer charges) | $521 | $243 | - | - | - | - | - | - | - |
$521
-
Tgal
|
|
08 | 3.5314: Use in-process recycling whenever possible | $327 | $50 | - | - | - | - | - |
$327
-
lb
|
- | - | |
09 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $986 | - | - | - | - | - | - |
$986
-
lb
|
- | - | |
10 | 3.5316: Contract a wood pallet recycling company | $711 | - | - | - | - | - | - |
$711
-
lb
|
- | - | |
11 | 3.7131: Use a rag recycle service | $4,295 | - | - | - | - | - | - | - |
$4,295
-
lb
|
- | |
TOTAL RECOMMENDED | $23,313 | $19,023 |
$2,912
69,754
kWh
|
$1,237
-
kW-mo/yr
|
$83 |
$692
-
MMBtu
|
$9,796
-
gal
|
$3,777
-
lb
|
$4,295
-
lb
|
$521
-
Tgal
|
||
TOTAL IMPLEMENTED | $11,109 | $50 | - | - | - | - |
$9,796
-
gal
|
$1,313
-
lb
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs