ITAC Assessment: NV0105
ITAC logo
ITAC Assessment: NV0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Plastic Products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 80,000
ft2
Annual Production 112,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,601 3,408,851
kWh
Electricity Demand $60,967 7,776
kW-mo/yr
Electricity Fees $8,426 -
Natural Gas $21,084 3,683
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $173,115 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $140,593

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.2437: Recover waste heat from equipment $2,700 $1,890 - - - $2,700
-
MMBtu
- - - -
02 2.2614: Use cooling tower or economizer to replace chiller cooling $9,271 $21,600 $7,687
181,125
kWh
$2,131
-
kW-mo/yr
$196 - - - - $(-743.0)
-
Tgal
03 2.2625: Chill water to the highest temperature possible $2,061 - $1,491
35,170
kWh
$530
-
kW-mo/yr
$40 - - - - -
04 2.5125: Size air handling grills/ duct/s coils to minimize air resistance $1,030 $1,267 $745
17,585
kWh
$265
-
kW-mo/yr
$20 - - - - -
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $9,488 $1,080 $4,770
112,544
kWh
$4,532
-
kW-mo/yr
$186 - - - - -
06 2.6231: Utilize controls to operate equipment only when needed $322 $150 $316
7,327
kWh
- $6 - - - - -
07 2.7134: Use photocell controls $1,872 $490 $1,429
33,705
kWh
$406
-
kW-mo/yr
$37 - - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $14,676 $50,495 $10,615
250,293
kWh
$3,773
-
kW-mo/yr
$288 - - - - -
09 2.7231: Use radiant heater for spot heating $2,679 $8,064 - - - $2,679
-
MMBtu
- - - -
10 4.621: Use fixtures to reduce machine changeout times $52,000 $14,200 - - - - - - $52,000 -
11 3.1192: Reduce scrap production $12,952 $75,000 $4,368
102,872
kWh
$1,552
-
kW-mo/yr
- - $792
-
lb
$6,240 - -
12 3.1192: Reduce scrap production $64,064 $375,750 - - - - $64,064
-
lb
- - -
TOTAL RECOMMENDED $173,115 $549,986 $31,421
740,621
kWh
$13,189
-
kW-mo/yr
$773 $5,379
-
MMBtu
$64,856
-
lb
$6,240 $52,000 $(-743.0)
-
Tgal
TOTAL IMPLEMENTED $140,593 $421,961 $14,693
346,424
kWh
$7,458
-
kW-mo/yr
$442 $2,679
-
MMBtu
$64,064
-
lb
- $52,000 $(-743.0)
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs