ITAC Assessment: OR0296
ITAC logo
ITAC Assessment: OR0296
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Meatless sandwich patties
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 36,000
ft2
Annual Production 17,060,941
lb
Production Hrs. Annual 7,140
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,450 2,297,773
kWh
Electricity Demand $15,317 4,284
kW-mo/yr
Natural Gas $45,620 13,058
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $385,716 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $333,131

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 4.611: Begin a practice of predictive / preventative maintenance $330,000 - - - - - - $330,000
02 3.5317: Sell / offer by-product as animal feed $1,730 $1,200 - - $1,730
-
lb
- - -
03 2.7243: Improve air circulation with destratification fans / other methods $37,150 $1,000 - - - - - $37,150
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,145 $5,160 $1,665
48,945
kWh
$320
-
kW-mo/yr
- $1,730 $430 -
05 2.4133: Use most efficient type of electric motors $3,131 $4,179 $2,423
71,512
kWh
$708
-
kW-mo/yr
- - - -
06 2.2621: Modify refrigeration system to operate at a lower pressure $9,560 $25,500 $9,560
281,360
kWh
- - - - -
TOTAL RECOMMENDED $385,716 $37,039 $13,648
401,817
kWh
$1,028
-
kW-mo/yr
$1,730
-
lb
$1,730 $430 $367,150
TOTAL IMPLEMENTED $333,131 $4,179 $2,423
71,512
kWh
$708
-
kW-mo/yr
- - - $330,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs