ITAC Assessment: OR0503
ITAC logo
ITAC Assessment: OR0503
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Fruit Puree
NAICS 311422: Specialty Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 290
Plant Area 653,400
ft2
Annual Production 80,000
ton
Production Hrs. Annual 6,336
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $154,590 7,987,180
kWh
Electricity Demand $50,081 11,180
kW-mo/yr
Natural Gas $2,091,106 204,269
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $186,121 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $157,941

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $37,500 $42,500 $(-6,500.0)
(-180,000)
kWh
$(-1,100.0)
-
kW-mo/yr
- $29,500
-
MMBtu
$15,600
-
Tgal
- -
02 2.1321: Replace fossil fuel equipment with electrical equipment $23,480 $24,300 $(-23,330.0)
(-679,460)
kWh
$(-4,080.0)
-
kW-mo/yr
- $30,890
-
MMBtu
- - $20,000
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $17,800 $36,000 $4,900
140,700
kWh
$1,900
-
kW-mo/yr
- - - $11,000
-
gal
-
04 4.431: Train operators for maximum operating efficiency $50,800 $11,300 - - - - - - $50,800
05 3.7122: Maximize production runs to reduce cleaning $46,500 - - - - - - - $46,500
06 2.2136: Install / repair insulation on steam lines $5,341 $600 - - - $5,341
-
MMBtu
- - -
07 2.3212: Optimize plant power factor $4,700 $18,300 - - $4,700 - - - -
TOTAL RECOMMENDED $186,121 $133,000 $(-24,930.0)
(-718,760)
kWh
$(-3,280.0)
-
kW-mo/yr
$4,700 $65,731
-
MMBtu
$15,600
-
Tgal
$11,000
-
gal
$117,300
TOTAL IMPLEMENTED $157,941 $90,400 $(-1,600.0)
(-39,300)
kWh
$800
-
kW-mo/yr
- $34,841
-
MMBtu
$15,600
-
Tgal
$11,000
-
gal
$97,300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs