ITAC Assessment: NV0103
ITAC logo
ITAC Assessment: NV0103
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Lightning Protection Equipment
NAICS
n/a
SIC 3643: Current-Carrying Wiring Devices
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 53,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,017 335,873
kWh
Electricity Demand $11,470 1,236
kW-mo/yr
Electricity Fees $600 -
Natural Gas $4,706 715
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,567

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings By-product Production Savings
01 2.4221: Install compressor air intakes in coolest locations $179 $137 $108
2,638
kWh
$71
-
kW-mo/yr
- - - -
02 2.7134: Use photocell controls $550 $200 $238
5,569
kWh
$312
-
kW-mo/yr
- - - -
03 2.7243: Improve air circulation with destratification fans / other methods $912 $750 - - $912
-
MMBtu
- - -
04 4.652: Replace existing equipment with more suitable substitutes $44,986 $9,960 - - - - - $44,986
05 4.114: Add/modify equipment to improve drying process $22,940 $7,800 - - - - $22,940 -
06 3.5212: Regrind, reuse, or sell scrap plastic parts $33 - - - - $33
-
lb
- -
TOTAL RECOMMENDED $69,600 $18,847 $346
8,207
kWh
$383
-
kW-mo/yr
$912
-
MMBtu
$33
-
lb
$22,940 $44,986
TOTAL IMPLEMENTED $69,567 $18,847 $346
8,207
kWh
$383
-
kW-mo/yr
$912
-
MMBtu
- $22,940 $44,986
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs