ITAC Assessment: NV0101
ITAC logo
ITAC Assessment: NV0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Plastic Foam Products
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area 40,000
ft2
Annual Production 25,000,000
units
Production Hrs. Annual 5,473
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $7,127 169,109
kWh
Electricity Demand $7,981 860
kW-mo/yr
Electricity Fees $914 -
Natural Gas $26,375 5,082
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,776 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,094

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $166 $200 $163
3,810
kWh
$3 - - -
02 2.4221: Install compressor air intakes in coolest locations $87 $74 $85
2,052
kWh
$2 - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $234 $50 $229
5,569
kWh
$5 - - -
04 2.1133: Adjust burners for efficient operation $341 $600 - - $341
-
MMBtu
- -
05 2.2511: Insulate bare equipment $337 $255 - - $337
-
MMBtu
- -
06 4.211: Consider use / purchase of bulk materials where possible $51,111 $60,000 - - - - $51,111
07 4.321: Optimize production lot sizes and inventories $16,500 $66,275 - - - $16,500 -
TOTAL RECOMMENDED $68,776 $127,454 $477
11,431
kWh
$10 $678
-
MMBtu
$16,500 $51,111
TOTAL IMPLEMENTED $17,094 $67,149 $248
5,862
kWh
$5 $341
-
MMBtu
$16,500 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs