ITAC Assessment: NC0069
ITAC logo
ITAC Assessment: NC0069
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Rubber Products
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 137,500
ft2
Annual Production 2,250,000
lb
Production Hrs. Annual 5,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $594,446 9,129,250
kWh
Natural Gas $68,995 15,796
MMBtu
Other Energy $152,675 136,317
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,483 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,468

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,000 $45,000 $21,000
419,988
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $388 $300 $388
6,741
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $580 $588 $580
9,965
kWh
- -
04 2.4133: Use most efficient type of electric motors $192 $168 $192
3,224
kWh
- -
05 2.7314: Reduce ventilation air $782 $1,250 - - $782
-
MMBtu
06 2.2511: Insulate bare equipment $538 $864 - - $538
-
MMBtu
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $20,681 $40,000 $42,241
746,190
kWh
- $(-21,560.0)
-
MMBtu
08 2.4131: Size electric motors for peak operating efficiency $6,888 $7,500 $6,888
137,749
kWh
- -
09 2.1335: Replace gasoline with diesel, lpg, or natural gas $5,434 $7,200 - $6,865
-
MMBtu
$(-1,431.0)
-
MMBtu
TOTAL RECOMMENDED $56,483 $102,870 $71,289
1,323,857
kWh
$6,865
-
MMBtu
$(-21,671.0)
-
MMBtu
TOTAL IMPLEMENTED $28,468 $52,968 $28,468
567,702
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs