ITAC Assessment: NV0100
ITAC logo
ITAC Assessment: NV0100
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Plastic Products, Not Elsewhere Classified
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 450,000
ft2
Annual Production 445,000
lb
Production Hrs. Annual 4,394
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,103 1,094,373
kWh
Electricity Demand $36,229 3,904
kW-mo/yr
Electricity Fees $2,298 -
Natural Gas $3,990 739
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,138 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,260

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $917 $150 $899
21,688
kWh
- $18 - -
02 2.4133: Use most efficient type of electric motors $233 $326 $141
3,517
kWh
$86
-
kW-mo/yr
$6 - -
03 2.2437: Recover waste heat from equipment $1,558 $1,890 - - - $1,558
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $443 $135 $434
10,551
kWh
- $9 - -
05 2.7134: Use photocell controls $2,667 $495 $2,054
137,163
kWh
$561
-
kW-mo/yr
$52 - -
06 4.422: Utilize outside contracting $42,320 $25,000 - - - - $42,320
TOTAL RECOMMENDED $48,138 $27,996 $3,528
172,919
kWh
$647
-
kW-mo/yr
$85 $1,558
-
MMBtu
$42,320
TOTAL IMPLEMENTED $4,260 $1,106 $3,528
172,919
kWh
$647
-
kW-mo/yr
$85 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs