Assessment Year | 1998 |
---|---|
Principal Product | PVC pipe |
NAICS |
n/a
|
SIC | 3084: Plastics Pipe |
Sales Range | $100 M to 500M |
# of Employees | 125 |
Plant Area |
75,000
ft2
|
Annual Production | 100,000,000
lb
|
Production Hrs. Annual | 8,712
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $855,567 | 19,439,918 |
kWh
|
$0.044 |
Electricity Demand | $21,756 | 30,978 |
kW-mo/yr
|
$0.70 |
Electricity Fees | $(-66,854.0) | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $427,387 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7134: Use photocell controls | $211 | $170 |
$232
5,862
kWh
|
$8
-
kW-mo/yr
|
$(-29.0) | - | - | |
02 | 2.3212: Optimize plant power factor | $3,856 | $39,434 | - | - | $3,856 | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $201 | $134 |
$225
4,982
kWh
|
$2
-
kW-mo/yr
|
$(-26.0) | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $2,652 | $3,716 |
$2,969
67,409
kWh
|
$22
-
kW-mo/yr
|
$(-339.0) | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,183 | $350 |
$1,335
30,481
kWh
|
- | $(-152.0) | - | - | |
06 | 2.2511: Insulate bare equipment | $8,339 | $20,795 |
$9,338
212,192
kWh
|
$68
-
kW-mo/yr
|
$(-1,067.0) | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,667 | $4,686 |
$6,399
145,369
kWh
|
- | $(-732.0) | - | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,827 | $440 |
$5,449
123,974
kWh
|
- | $(-622.0) | - | - | |
09 | 3.4151: Minimize water usage | $253,656 | $65,958 | - | - | - | - | $253,656 | |
10 | 4.513: Re-arrange equipment layout to reduce labor costs | $62,013 | $30,000 | - | - | - | $62,013 | - | |
11 | 2.8114: Change rate schedules or other changes in utility service | $81,047 | $500 | - | - | - | $81,047 | - | |
12 | 4.812: Apply for investment incentives | $3,735 | $471 | - | - | - | $3,735 | - | |
TOTAL RECOMMENDED | $427,387 | $166,654 |
$25,947
590,269
kWh
|
$100
-
kW-mo/yr
|
$889 | $146,795 | $253,656 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs