ITAC Assessment: NV0097
ITAC logo
ITAC Assessment: NV0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product PVC pipe
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $100
M
to 500
M
# of Employees 125
Plant Area 75,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 8,712
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $855,567 19,439,918
kWh
Electricity Demand $21,756 30,978
kW-mo/yr
Electricity Fees $(-66,854.0) -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $427,387 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Primary Raw Material Savings
01 2.7134: Use photocell controls $211 $170 $232
5,862
kWh
$8
-
kW-mo/yr
$(-29.0) - -
02 2.3212: Optimize plant power factor $3,856 $39,434 - - $3,856 - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $201 $134 $225
4,982
kWh
$2
-
kW-mo/yr
$(-26.0) - -
04 2.4133: Use most efficient type of electric motors $2,652 $3,716 $2,969
67,409
kWh
$22
-
kW-mo/yr
$(-339.0) - -
05 2.4221: Install compressor air intakes in coolest locations $1,183 $350 $1,335
30,481
kWh
- $(-152.0) - -
06 2.2511: Insulate bare equipment $8,339 $20,795 $9,338
212,192
kWh
$68
-
kW-mo/yr
$(-1,067.0) - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $5,667 $4,686 $6,399
145,369
kWh
- $(-732.0) - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,827 $440 $5,449
123,974
kWh
- $(-622.0) - -
09 3.4151: Minimize water usage $253,656 $65,958 - - - - $253,656
10 4.513: Re-arrange equipment layout to reduce labor costs $62,013 $30,000 - - - $62,013 -
11 2.8114: Change rate schedules or other changes in utility service $81,047 $500 - - - $81,047 -
12 4.812: Apply for investment incentives $3,735 $471 - - - $3,735 -
TOTAL RECOMMENDED $427,387 $166,654 $25,947
590,269
kWh
$100
-
kW-mo/yr
$889 $146,795 $253,656
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs