ITAC Assessment: NV0087
ITAC logo
ITAC Assessment: NV0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Measuring & Controlling Devices
NAICS
n/a
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 600
Plant Area 92,410
ft2
Annual Production 1,560,000
pieces
Production Hrs. Annual 4,508
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,347 2,169,988
kWh
Electricity Demand $51,605 12,661
kW-mo/yr
Electricity Fees $(-350.0) -
Natural Gas $8,720 1,650
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,242 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7134: Use photocell controls $199 $180 $137
2,931
kWh
$62
-
kW-mo/yr
02 2.7111: Reduce illumination to minimum necessary levels $510 $138 $349
7,620
kWh
$161
-
kW-mo/yr
03 2.7135: Install occupancy sensors $2,072 $1,148 $1,791
38,687
kWh
$281
-
kW-mo/yr
04 2.7111: Reduce illumination to minimum necessary levels $1,500 $472 $1,154
24,912
kWh
$346
-
kW-mo/yr
05 2.4221: Install compressor air intakes in coolest locations $398 $290 $398
8,499
kWh
-
06 2.6231: Utilize controls to operate equipment only when needed $1,563 $1,350 $1,266
27,550
kWh
$297
-
kW-mo/yr
TOTAL RECOMMENDED $6,242 $3,578 $5,095
110,199
kWh
$1,147
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs