ITAC Assessment: NV0086
ITAC logo
ITAC Assessment: NV0086
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Fermented Olivers
NAICS
n/a
SIC 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area 115,200
ft2
Annual Production 960
ton
Production Hrs. Annual 2,431
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,391 152,110
kWh
Electricity Demand $4,501 1,009
kW-mo/yr
Electricity Fees $2,520 -
Natural Gas $632 85
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $101,543 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,131

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings By-product Production Savings Increase in Production Savings
01 2.7261: Install timers and/or thermostats $596 $180 $288
2,345
kWh
- $308
-
MMBtu
- - - -
02 2.4133: Use most efficient type of electric motors $320 $368 $237
2,931
kWh
$83
-
kW-mo/yr
- - - - -
03 2.7111: Reduce illumination to minimum necessary levels $2,051 $225 $1,615
19,930
kWh
$436
-
kW-mo/yr
- - - - -
04 2.7135: Install occupancy sensors $2,116 $526 $1,758
21,688
kWh
$358
-
kW-mo/yr
- - - - -
05 3.5212: Regrind, reuse, or sell scrap plastic parts $2,500 $49 - - - - - $2,500 -
06 4.445: Install equipment to move product $8,565 $7,860 - - - - $8,565 - -
07 4.425: Eliminate/reduce redundant inspections $8,845 $4,800 - - - - $8,845 - -
08 4.445: Install equipment to move product $34,460 $12,000 - - - - $34,460 - -
09 4.122: Develop standard procedures to improve internal yields $41,700 $650 - - - - - - $41,700
10 3.1191: Change procedures / equipment / operating conditions $390 $300 - - - $390
-
lb
- - -
TOTAL RECOMMENDED $101,543 $26,958 $3,898
46,894
kWh
$877
-
kW-mo/yr
$308
-
MMBtu
$390
-
lb
$51,870 $2,500 $41,700
TOTAL IMPLEMENTED $57,131 $25,602 $1,852
22,861
kWh
$519
-
kW-mo/yr
- $390
-
lb
$51,870 $2,500 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings By-product Production Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs