ITAC Assessment: NV0077
ITAC logo
ITAC Assessment: NV0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Custom Moulded Plastic Products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 50,000
ft2
Annual Production 850,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,325 1,594,959
kWh
Electricity Demand $43,621 4,883
kW-mo/yr
Electricity Fees $878 -
Natural Gas $1,955 308
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,193 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,725

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
01 2.2511: Insulate bare equipment $8,983 $1,120 $6,804
152,110
kWh
$2,179
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,478 $300 $1,478
33,118
kWh
- - - -
03 2.4133: Use most efficient type of electric motors $353 $404 $268
6,155
kWh
$85
-
kW-mo/yr
- - -
04 2.7243: Improve air circulation with destratification fans / other methods $1,293 $2,925 $(-135.0)
(-2,931)
kWh
$(-44.0)
-
kW-mo/yr
$1,472
-
MMBtu
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $1,167 $815 - - $1,167
-
MMBtu
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $839 $50 $839
18,757
kWh
- - - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $8,002 $250 - - - $8,002
-
lb
-
08 3.5313: Increase amount of waste recovered for resale $78 - - - - $78
-
lb
-
09 4.321: Optimize production lot sizes and inventories $35,000 $28,000 - - - - $35,000
TOTAL RECOMMENDED $57,193 $33,864 $9,254
207,209
kWh
$2,220
-
kW-mo/yr
$2,639
-
MMBtu
$8,080
-
lb
$35,000
TOTAL IMPLEMENTED $45,725 $29,365 $1,478
33,118
kWh
- $1,167
-
MMBtu
$8,080
-
lb
$35,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs