Assessment Year | 1996 |
---|---|
Principal Product | Hot Water Heaters |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $50 M to 100M |
# of Employees | 280 |
Plant Area |
144,000
ft2
|
Annual Production | 364,000
pieces
|
Production Hrs. Annual | 5,070
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $315,067 | 4,511,430 |
kWh
|
$0.070 |
Electricity Demand | $97,975 | 10,583 |
kW-mo/yr
|
$9.26 |
Electricity Fees | $6,670 | - |
|
- |
Natural Gas | $302,385 | 64,137 |
MMBtu
|
$4.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $277,193 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $264,681 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,203 | $200 |
$1,203
26,377
kWh
|
- | - | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $121 | $100 |
$121
1,758
kWh
|
- | - | - | - | |
03 | 2.2511: Insulate bare equipment | $202 | $460 |
$202
1,465
kWh
|
- | - | - | - | |
04 | 2.6218: Turn off equipment when not in use | $6,568 | - |
$6,568
143,318
kWh
|
- | - | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $4,439 | $1,505 |
$1,677
36,635
kWh
|
$2,762
-
kW-mo/yr
|
- | - | - | |
06 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $12,310 | $850 | - | - |
$12,310
-
MMBtu
|
- | - | |
07 | 3.1191: Change procedures / equipment / operating conditions | $240,000 | $600,000 | - | - | - | - | $240,000 | |
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $12,350 | $15,000 | - | - | - |
$12,350
-
lb
|
- | |
TOTAL RECOMMENDED | $277,193 | $618,115 |
$9,771
209,553
kWh
|
$2,762
-
kW-mo/yr
|
$12,310
-
MMBtu
|
$12,350
-
lb
|
$240,000 | ||
TOTAL IMPLEMENTED | $264,681 | $616,805 |
$9,569
208,088
kWh
|
$2,762
-
kW-mo/yr
|
- |
$12,350
-
lb
|
$240,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs