ITAC Assessment: NV0068
ITAC logo
ITAC Assessment: NV0068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Hot Water Heaters
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $50
M
to 100
M
# of Employees 280
Plant Area 144,000
ft2
Annual Production 364,000
pieces
Production Hrs. Annual 5,070
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $315,067 4,511,430
kWh
Electricity Demand $97,975 10,583
kW-mo/yr
Electricity Fees $6,670 -
Natural Gas $302,385 64,137
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $277,193 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $264,681

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,203 $200 $1,203
26,377
kWh
- - - -
02 2.4221: Install compressor air intakes in coolest locations $121 $100 $121
1,758
kWh
- - - -
03 2.2511: Insulate bare equipment $202 $460 $202
1,465
kWh
- - - -
04 2.6218: Turn off equipment when not in use $6,568 - $6,568
143,318
kWh
- - - -
05 2.4133: Use most efficient type of electric motors $4,439 $1,505 $1,677
36,635
kWh
$2,762
-
kW-mo/yr
- - -
06 2.2449: Recover heat from exhausted steam, hot air or hot water $12,310 $850 - - $12,310
-
MMBtu
- -
07 3.1191: Change procedures / equipment / operating conditions $240,000 $600,000 - - - - $240,000
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $12,350 $15,000 - - - $12,350
-
lb
-
TOTAL RECOMMENDED $277,193 $618,115 $9,771
209,553
kWh
$2,762
-
kW-mo/yr
$12,310
-
MMBtu
$12,350
-
lb
$240,000
TOTAL IMPLEMENTED $264,681 $616,805 $9,569
208,088
kWh
$2,762
-
kW-mo/yr
- $12,350
-
lb
$240,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs