ITAC Assessment: NV0023
ITAC logo
ITAC Assessment: NV0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Precision Sheet Metal Parts
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 167
Plant Area 19,600
ft2
Annual Production 8,000,000
pieces
Production Hrs. Annual 7,000
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,115 1,415,592
kWh
Natural Gas $48,827 9,705
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,098 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,218

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8123: Pay utility bills on time $1,013 - $1,013
-
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,321 $461 $5,321
75,322
kWh
-
03 2.2511: Insulate bare equipment $1,781 $1,245 - $1,781
-
MMBtu
04 2.1122: Re-size charging openings or add a movable door on equipment $4,488 $1,600 - $4,488
-
MMBtu
05 3.6192: Use a less expensive method of waste removal $31,162 $100,000 - $31,162
-
MMBtu
06 2.7135: Install occupancy sensors $2,296 $224 $2,296
32,532
kWh
-
07 2.4133: Use most efficient type of electric motors $1,613 $694 $1,613
22,860
kWh
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $424 $100 $424
5,862
kWh
-
TOTAL RECOMMENDED $48,098 $104,324 $10,667
136,576
kWh
$37,431
-
MMBtu
TOTAL IMPLEMENTED $3,218 $1,345 $1,437
5,862
kWh
$1,781
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs