ITAC Assessment: NV0066
ITAC logo
ITAC Assessment: NV0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Printed Paper Products
NAICS
n/a
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 140,000
ft2
Annual Production 17,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,674 2,031,946
kWh
Electricity Demand $48,707 5,286
kW-mo/yr
Electricity Fees $3,460 -
Natural Gas $21,825 4,215
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,753 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,418

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $90 $31 $66
1,465
kWh
$24
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $1,307 $270 $1,307
30,188
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,462 $200 $1,462
33,705
kWh
- - - -
04 2.7243: Improve air circulation with destratification fans / other methods $4,678 $11,375 - - - $4,678
-
MMBtu
-
05 2.7135: Install occupancy sensors $245 $94 $245
4,396
kWh
- - - -
06 2.3212: Optimize plant power factor $657 $1,760 - - $657 - -
07 2.2447: Heat water with exhaust heat $5,214 $3,300 $253
5,862
kWh
$82
-
kW-mo/yr
- $4,879
-
MMBtu
-
08 3.5313: Increase amount of waste recovered for resale $3,100 - - - - - $3,100
-
lb
TOTAL RECOMMENDED $16,753 $17,030 $3,333
75,616
kWh
$106
-
kW-mo/yr
$657 $9,557
-
MMBtu
$3,100
-
lb
TOTAL IMPLEMENTED $11,418 $3,895 $3,333
75,616
kWh
$106
-
kW-mo/yr
- $4,879
-
MMBtu
$3,100
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs