| Assessment Year | 2005 |
|---|---|
| Principal Product | Steel Machining/Assembly |
| NAICS | 332312: Fabricated Structural Metal Manufacturing |
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $10 M to 50M |
| # of Employees | 135 |
| Plant Area |
125,000
ft2
|
| Annual Production | 60,000
pieces
|
| Production Hrs. Annual | 4,080
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $99,278 | 2,105,326 |
kWh
|
$0.047 |
| Electricity Demand | $26,254 | 8,288 |
kW-mo/yr
|
$3.17 |
| Electricity Fees | $53,426 | - |
|
- |
| Natural Gas | $104,828 | 10,663 |
MMBtu
|
$9.83 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $36,000 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,687 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,255 | $21,983 |
$12,570
277,083
kWh
|
$2,545
-
kW-mo/yr
|
$6,140 | - | |
| 02 | 2.2511: Insulate bare equipment | $8,073 | $710 | - | - | - |
$8,073
-
MMBtu
|
|
| 03 | 2.7124: Make a practice of turning off lights when not needed | $3,012 | $34 |
$1,799
39,658
kWh
|
$339
-
kW-mo/yr
|
$874 | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,614 | $228 |
$1,809
39,882
kWh
|
- | $805 | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $795 | $2,627 |
$475
10,466
kWh
|
$90
-
kW-mo/yr
|
$230 | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $251 | $358 |
$125
2,762
kWh
|
$58
-
kW-mo/yr
|
$68 | - | |
| TOTAL RECOMMENDED | $36,000 | $25,940 |
$16,778
369,851
kWh
|
$3,032
-
kW-mo/yr
|
$8,117 |
$8,073
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $10,687 | $938 |
$1,809
39,882
kWh
|
- | $805 |
$8,073
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs