Assessment Year | 2001 |
---|---|
Principal Product | Non Ferrous and Magnesium Castings |
NAICS |
n/a
|
SIC | 3365: Aluminum Foundries |
Sales Range | $1 M to 5M |
# of Employees | 18 |
Plant Area |
30,000
ft2
|
Annual Production | 325,000
lb
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $19,762 | 341,764 |
kWh
|
$0.058 |
Electricity Demand | $27,863 | 2,332 |
kW-mo/yr
|
$11.95 |
Electricity Fees | $438 | - |
|
- |
Natural Gas | $15,866 | 3,270 |
MMBtu
|
$4.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,949 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,395 | $1,555 |
$1,417
32,268
kWh
|
$1,978
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,121 | $700 |
$468
10,668
kWh
|
$653
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $966 | - |
$403
9,175
kWh
|
$563
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7135: Install occupancy sensors | $702 | $450 |
$308
7,005
kWh
|
$394
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.2437: Recover waste heat from equipment | $691 | $750 | - | - |
$691
-
MMBtu
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $507 | $462 |
$219
17
kWh
|
$82
-
kW-mo/yr
|
- | $206 | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $180 | $150 |
$75
6
kWh
|
$105
-
kW-mo/yr
|
- | - | - | - | |
08 | 4.521: Clear and rent existing space | $16,920 | $20,000 | - | - | - | - | - | $16,920 | |
09 | 4.322: Eliminate old stock and modify inventory control | $4,050 | $1,450 | - | - | - | $4,050 | - | - | |
10 | 4.447: Automate payroll system | $2,262 | $2,500 | - | - | - | - | $2,262 | - | |
11 | 4.821: Pay bills on time to avoid late fees | $155 | - | - | - | - | - | $155 | - | |
TOTAL RECOMMENDED | $30,949 | $28,017 |
$2,890
59,139
kWh
|
$3,775
-
kW-mo/yr
|
$691
-
MMBtu
|
$4,256 | $2,417 | $16,920 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs