ITAC Assessment: NV0065
ITAC logo
ITAC Assessment: NV0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Cement
NAICS
n/a
SIC 3241: Cement, Hydraulic
Sales Range $50
M
to 100
M
# of Employees 122
Plant Area 240,000
ft2
Annual Production 600,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,083,421 72,909,145
kWh
Electricity Demand $1,095,111 122,220
kW-mo/yr
Electricity Fees $(-477,748.0) -
Natural Gas $1,799,543 2,190,748
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $259,427 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,298

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Gaseous Waste Savings
01 2.4133: Use most efficient type of electric motors $16,835 $3,582 $13,050
308,324
kWh
$3,785
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $12,129 $650 $12,129
286,635
kWh
- -
03 2.7144: Install spectral reflectors / delamp $463 $25 $222
5,275
kWh
$241
-
kW-mo/yr
-
04 3.5311: Recover and reuse waste material $230,000 $40,000 - - $230,000
-
lb
TOTAL RECOMMENDED $259,427 $44,257 $25,401
600,234
kWh
$4,026
-
kW-mo/yr
$230,000
-
lb
TOTAL IMPLEMENTED $17,298 $3,607 $13,272
313,599
kWh
$4,026
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs