ITAC Assessment: NV0052
ITAC logo
ITAC Assessment: NV0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Rail Cars
NAICS
n/a
SIC 3743: Railroad Equipment
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 68,000
ft2
Annual Production 30
pieces
Production Hrs. Annual 2,366
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,985 1,005,862
kWh
Electricity Demand $23,415 3,104
kW-mo/yr
Natural Gas $22,282 3,186
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,465 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,035

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7144: Install spectral reflectors / delamp $1,741 $100 $1,131
16,706
kWh
$610
-
kW-mo/yr
- -
02 2.7243: Improve air circulation with destratification fans / other methods $1,689 $3,250 - - $1,689
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $121 $100 $121
1,758
kWh
- - -
04 3.5313: Increase amount of waste recovered for resale $4,914 - - - - $4,914
-
lb
TOTAL RECOMMENDED $8,465 $3,450 $1,252
18,464
kWh
$610
-
kW-mo/yr
$1,689
-
MMBtu
$4,914
-
lb
TOTAL IMPLEMENTED $5,035 $100 $121
1,758
kWh
- - $4,914
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs