ITAC Assessment: NV0048
ITAC logo
ITAC Assessment: NV0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product custom compounded plastic resins
NAICS
n/a
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 60,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,521 2,700,762
kWh
Electricity Demand $61,316 7,795
kW-mo/yr
Electricity Fees $5,463 -
Natural Gas $12,488 2,207
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,694

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.3212: Optimize plant power factor $1,263 $3,525 - - $1,263 - -
02 2.7243: Improve air circulation with destratification fans / other methods $1,698 $4,225 - - - $1,698
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $7,602 $21,840 $4,951
109,906
kWh
$2,651
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $513 $260 $513
11,430
kWh
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,300 $600 $1,300
29,015
kWh
- - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $438 $100 $438
9,965
kWh
- - - -
07 2.7111: Reduce illumination to minimum necessary levels $394 $25 $281
7,620
kWh
$113
-
kW-mo/yr
- - -
08 2.7135: Install occupancy sensors $503 $164 $423
9,379
kWh
$80
-
kW-mo/yr
- - -
09 3.5313: Increase amount of waste recovered for resale $105 $30 - - - - $105
-
lb
TOTAL RECOMMENDED $13,816 $30,769 $7,906
177,315
kWh
$2,844
-
kW-mo/yr
$1,263 $1,698
-
MMBtu
$105
-
lb
TOTAL IMPLEMENTED $1,694 $625 $1,581
36,635
kWh
$113
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs