Assessment Year | 1995 |
---|---|
Principal Product | Commercial Steel Tanks and Waste Handling Equipment |
NAICS |
n/a
|
SIC | 3569: General Industrial Machinery and Equipment, Not Elsewhere |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
40,000
ft2
|
Annual Production | 2,900
pieces
|
Production Hrs. Annual | 4,836
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $59,512 | 688,453 |
kWh
|
$0.086 |
Natural Gas | $40,945 | 7,145 |
MMBtu
|
$5.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,127 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,659 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $3,020 | $3,237 | - |
$3,020
-
MMBtu
|
|
02 | 2.7144: Install spectral reflectors / delamp | $158 | $25 |
$158
2,345
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $211 | $110 |
$211
4,689
kWh
|
- | |
04 | 2.2437: Recover waste heat from equipment | $569 | $1,400 | - |
$569
-
MMBtu
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $758 | - |
$758
16,999
kWh
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $881 | $300 |
$881
19,930
kWh
|
- | |
07 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $657 | $695 |
$657
6,741
kWh
|
- | |
08 | 2.7229: Air condition only space necessary | $873 | $1,660 |
$873
4,396
kWh
|
- | |
TOTAL RECOMMENDED | $7,127 | $7,427 |
$3,538
55,100
kWh
|
$3,589
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,659 | $3,537 |
$1,639
36,929
kWh
|
$3,020
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs