ITAC Assessment: NV0045
ITAC logo
ITAC Assessment: NV0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Commercial Steel Tanks and Waste Handling Equipment
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 40,000
ft2
Annual Production 2,900
pieces
Production Hrs. Annual 4,836
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,512 688,453
kWh
Natural Gas $40,945 7,145
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,127 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,659

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $3,020 $3,237 - $3,020
-
MMBtu
02 2.7144: Install spectral reflectors / delamp $158 $25 $158
2,345
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $211 $110 $211
4,689
kWh
-
04 2.2437: Recover waste heat from equipment $569 $1,400 - $569
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $758 - $758
16,999
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $881 $300 $881
19,930
kWh
-
07 2.7121: Utilize daylight whenever possible in lieu of artificial light $657 $695 $657
6,741
kWh
-
08 2.7229: Air condition only space necessary $873 $1,660 $873
4,396
kWh
-
TOTAL RECOMMENDED $7,127 $7,427 $3,538
55,100
kWh
$3,589
-
MMBtu
TOTAL IMPLEMENTED $4,659 $3,537 $1,639
36,929
kWh
$3,020
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs