| Assessment Year | 1995 |
|---|---|
| Principal Product | Commercial Steel Tanks and Waste Handling Equipment |
| NAICS |
n/a
|
| SIC | 3569: General Industrial Machinery and Equipment, Not Elsewhere |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
40,000
ft2
|
| Annual Production | 2,900
pieces
|
| Production Hrs. Annual | 4,836
hrs
|
| Location (State) | Nevada |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $59,512 | 688,453 |
kWh
|
$0.086 |
| Natural Gas | $40,945 | 7,145 |
MMBtu
|
$5.73 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,127 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,659 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7224: Reduce space conditioning during non-working hours | $3,020 | $3,237 | - |
$3,020
-
MMBtu
|
|
| 02 | 2.7144: Install spectral reflectors / delamp | $158 | $25 |
$158
2,345
kWh
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $211 | $110 |
$211
4,689
kWh
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $569 | $1,400 | - |
$569
-
MMBtu
|
|
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $758 | - |
$758
16,999
kWh
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $881 | $300 |
$881
19,930
kWh
|
- | |
| 07 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $657 | $695 |
$657
6,741
kWh
|
- | |
| 08 | 2.7229: Air condition only space necessary | $873 | $1,660 |
$873
4,396
kWh
|
- | |
| TOTAL RECOMMENDED | $7,127 | $7,427 |
$3,538
55,100
kWh
|
$3,589
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $4,659 | $3,537 |
$1,639
36,929
kWh
|
$3,020
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs