ITAC Assessment: NV0042
ITAC logo
ITAC Assessment: NV0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Wood Mouldings
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 74
Plant Area 60,500
ft2
Annual Production 18,000,000
units
Production Hrs. Annual 4,550
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $190,914 2,606,389
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,013

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $2,185 $1,514 $2,185
32,239
kWh
02 2.6212: Turn off equipment during breaks, reduce operating time $852 - $852
16,120
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,310 $550 $1,310
24,912
kWh
04 2.4221: Install compressor air intakes in coolest locations $159 $110 $159
2,931
kWh
05 2.7135: Install occupancy sensors $324 $491 $324
6,155
kWh
06 2.3212: Optimize plant power factor $884 $7,500 $884
-
kWh
07 2.7121: Utilize daylight whenever possible in lieu of artificial light $666 - $666
12,603
kWh
TOTAL RECOMMENDED $6,380 $10,165 $6,380
94,960
kWh
TOTAL IMPLEMENTED $5,013 $2,064 $5,013
85,874
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs