ITAC Assessment: NV0037
ITAC logo
ITAC Assessment: NV0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Wood Strips and Mouldings
NAICS
n/a
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 70,000
ft2
Annual Production 9,600,000
units
Production Hrs. Annual 1,700
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $254,108 2,100,528
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,867 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,213

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $2,750 $688 $2,750
23,154
kWh
02 2.3212: Optimize plant power factor $2,654 $5,355 $2,654
-
kWh
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $4,969 $275 $4,969
41,911
kWh
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,474 $280 $1,474
12,603
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $652 $240 $652
9,965
kWh
06 2.7261: Install timers and/or thermostats $1,088 $192 $1,088
13,189
kWh
07 2.6212: Turn off equipment during breaks, reduce operating time $2,280 - $2,280
34,877
kWh
TOTAL RECOMMENDED $15,867 $7,030 $15,867
135,699
kWh
TOTAL IMPLEMENTED $13,213 $1,675 $13,213
135,699
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs