ITAC Assessment: MZ0259
ITAC logo
ITAC Assessment: MZ0259
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product wastewater and sewage treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 51
Plant Area 1,407,000
ft2
Annual Production 5,110,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $380,151 7,969,258
kWh
Electricity Demand $117,983 34,730
kW-mo/yr
Natural Gas $43,992 5,766
MMBtu
Waste Disposal Costs
Water Usage $78,413 28,015,700
Tgal
TOTAL YEARLY COSTS $620,539
RECOMMENDED SAVINGS* $211,429 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,941

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,010 $29,034 $4,918
102,466
kWh
$852
-
kW-mo/yr
- - $1,240
02 2.7135: Install occupancy sensors $504 $780 $442
9,214
kWh
$62
-
kW-mo/yr
- - -
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $140,488 $304,000 $(-11,213.0)
(-233,611)
kWh
$(-1,299.0)
-
kW-mo/yr
- $153,000
-
lb
-
04 3.4115: Recover and reuse cooling water $63,427 $203,000 - - $63,427
-
Tgal
- -
TOTAL RECOMMENDED $211,429 $536,814 $(-5,853.0)
(-121,931)
kWh
$(-385.0)
-
kW-mo/yr
$63,427
-
Tgal
$153,000
-
lb
$1,240
TOTAL IMPLEMENTED $70,941 $232,814 $5,360
111,680
kWh
$914
-
kW-mo/yr
$63,427
-
Tgal
- $1,240
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs