ITAC Assessment: NV0026
ITAC logo
ITAC Assessment: NV0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Bottled SoftDrinks
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 48,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 2,184
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,234 708,089
kWh
Natural Gas $16,341 3,178
MMBtu
Fuel Oil #2 $5,636 1,042
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,082 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,041

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $3,631 $3,876 $3,631
40,739
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $368 $186 $368
4,103
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $529 $120 $529
5,862
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $218 $339 $218
2,345
kWh
-
05 2.2511: Insulate bare equipment $1,356 $60 - $1,356
-
MMBtu
06 2.2511: Insulate bare equipment $512 $320 - $512
-
MMBtu
07 2.2135: Repair and eliminate steam leaks $468 $20 - $468
-
MMBtu
TOTAL RECOMMENDED $7,082 $4,921 $4,746
53,049
kWh
$2,336
-
MMBtu
TOTAL IMPLEMENTED $1,041 $440 $529
5,862
kWh
$512
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs