ITAC Assessment: NV0021
ITAC logo
ITAC Assessment: NV0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Office Supply Packaging Products
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 34
Plant Area 48,000
ft2
Annual Production 200,000
lb
Production Hrs. Annual 2,184
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,953 666,764
kWh
Natural Gas $12,867 2,473
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,739 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $497

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $7,310 $34,560 - $7,310
-
MMBtu
02 2.4133: Use most efficient type of electric motors $723 $1,540 $723
8,206
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $497 $390 $497
5,862
kWh
-
04 2.4323: Use optimum size and capacity equipment $1,709 $5,000 $1,709
19,637
kWh
-
05 2.2511: Insulate bare equipment $215 $98 - $215
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,712 $1,374 $1,712
19,637
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,573 $3,052 $5,573
58,324
kWh
-
TOTAL RECOMMENDED $17,739 $46,014 $10,214
111,666
kWh
$7,525
-
MMBtu
TOTAL IMPLEMENTED $497 $390 $497
5,862
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs