Assessment Year | 1995 |
---|---|
Principal Product | Vinyl Sheeting |
NAICS |
n/a
|
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $10 M to 50M |
# of Employees | 121 |
Plant Area |
24,000
ft2
|
Annual Production | 21,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $387,368 | 6,187,280 |
kWh
|
$0.063 |
Natural Gas | $175,023 | 32,507 |
MMBtu
|
$5.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,056 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $4,667 | $6,209 |
$4,667
74,443
kWh
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $326 | $285 |
$326
5,275
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $875 | $120 |
$875
14,068
kWh
|
- | |
04 | 2.2136: Install / repair insulation on steam lines | $6,488 | $1,744 | - |
$6,488
-
MMBtu
|
|
05 | 2.2511: Insulate bare equipment | $10,116 | $3,439 | - |
$10,116
-
MMBtu
|
|
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,870 | $1,000 | - |
$6,870
-
MMBtu
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,507 | $792 |
$2,507
39,859
kWh
|
- | |
08 | 2.3212: Optimize plant power factor | $1,207 | $900 |
$1,207
-
kWh
|
- | |
TOTAL RECOMMENDED | $33,056 | $14,489 |
$9,582
133,645
kWh
|
$23,474
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs