ITAC Assessment: CW0118
ITAC logo
ITAC Assessment: CW0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Plastic pipe
NAICS 237110: Water and Sewer Line and Related Structures Construction
SIC 1623: Water, Sewer, Pipeline, and Communications and Power Line Construction
Sales Range $100
M
to 500
M
# of Employees 117
Plant Area 211,200
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $668,242 13,389,947
kWh
Electricity Demand $263,246 23,465
kW-mo/yr
Electricity Fees $80,998 -
Natural Gas $4,477 462
MMBtu
Waste Disposal Costs
Water Usage $4,331 180
Tgal
TOTAL YEARLY COSTS $1,021,294
RECOMMENDED SAVINGS* $108,576 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2511: Insulate bare equipment $65,757 $2,574 $50,297
1,005,937
kWh
$15,460
-
kW-mo/yr
- -
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $33,972 - $42,291
845,822
kWh
$(-8,319.1)
-
kW-mo/yr
- -
03 2.7491: Insulate glazing, walls, ceilings, and roofs $331 $458 - - $331
-
MMBtu
-
04 2.7135: Install occupancy sensors $479 $750 $479
9,589
kWh
- - -
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,306 - $7,306
146,126
kWh
- - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $731 - - - - $731
TOTAL RECOMMENDED $108,576 $3,781 $100,374
2,007,474
kWh
$7,141
-
kW-mo/yr
$331
-
MMBtu
$731
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs