Assessment Year | 2015 |
---|---|
Principal Product | Wire Products |
NAICS | 331222: Steel Wire Drawing |
SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
Sales Range | $50 M to 100M |
# of Employees | 61 |
Plant Area |
138,000
ft2
|
Annual Production | 25,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $215,547 | 3,716,325 |
kWh
|
$0.058 |
Electricity Demand | $40,965 | 11,540 |
kW-mo/yr
|
$3.55 |
Electricity Fees | $90,363 | - |
|
- |
Natural Gas | $178,556 | 19,074 |
MMBtu
|
$9.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $41,507 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,332 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,200 | - |
$1,069
18,431
kWh
|
$131
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $896 | $250 |
$896
15,456
kWh
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,001 | $300 |
$875
15,086
kWh
|
$126
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,582 | $1,000 |
$2,301
39,676
kWh
|
$280
-
kW-mo/yr
|
- | - | |
05 | 2.3212: Optimize plant power factor | $4,279 | $2,920 | - | - | $4,279 | - | |
06 | 2.7135: Install occupancy sensors | $6,858 | $8,310 |
$6,013
103,680
kWh
|
$735
-
kW-mo/yr
|
- | $110 | |
07 | 2.4226: Use / purchase optimum sized compressor | $24,691 | $65,000 |
$22,706
391,485
kWh
|
$1,984
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $41,507 | $77,780 |
$33,861
583,814
kWh
|
$3,257
-
kW-mo/yr
|
$4,279 | $110 | ||
TOTAL IMPLEMENTED | $36,332 | $74,610 |
$32,965
568,358
kWh
|
$3,257
-
kW-mo/yr
|
- | $110 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs