ITAC Assessment: NV0011
ITAC logo
ITAC Assessment: NV0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Milk and Dairy Products
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 41,000
ft2
Annual Production 25,550,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $230,144 3,852,579
kWh
Natural Gas $83,193 20,690
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,263 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,060

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $3,264 $(-3,025.0) $3,264
54,220
kWh
-
02 2.3212: Optimize plant power factor $1,387 $3,600 $1,387
-
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,918 $(-59.0) $1,918
31,946
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $478 $120 $478
7,913
kWh
-
05 2.6218: Turn off equipment when not in use $606 - $606
9,672
kWh
-
06 2.2437: Recover waste heat from equipment $11,100 $1,400 - $11,100
-
MMBtu
07 2.2511: Insulate bare equipment $597 $722 - $597
-
MMBtu
08 2.4221: Install compressor air intakes in coolest locations $4,913 $292 $4,913
82,063
kWh
-
TOTAL RECOMMENDED $24,263 $3,050 $12,566
185,814
kWh
$11,697
-
MMBtu
TOTAL IMPLEMENTED $23,060 $2,328 $11,960
176,142
kWh
$11,100
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs