ITAC Assessment: NV0010
ITAC logo
ITAC Assessment: NV0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Paper for Food Packaging
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $5
M
to 10
M
# of Employees 32
Plant Area 25,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,810 889,508
kWh
Natural Gas $31,226 5,948
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,142 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,963

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,502 $482 $1,502
19,343
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,150 $1,950 $6,150
79,426
kWh
-
03 2.1133: Adjust burners for efficient operation $4,473 $400 - $4,473
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $521 $120 $521
6,741
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $136 $200 $136
1,758
kWh
-
06 2.2628: Utilize a less expensive cooling method $1,179 $700 $1,179
15,240
kWh
-
07 2.2511: Insulate bare equipment $181 $138 $181
2,345
kWh
-
TOTAL RECOMMENDED $14,142 $3,990 $9,669
124,853
kWh
$4,473
-
MMBtu
TOTAL IMPLEMENTED $12,963 $3,290 $8,490
109,613
kWh
$4,473
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs