ITAC Assessment: KU0542
ITAC logo
ITAC Assessment: KU0542
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product ergonomic chairs
NAICS
n/a
SIC 2522: Office Furniture, Except Wood
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 150,000
ft2
Annual Production 100,800
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,182 955,158
kWh
Electricity Demand $19,430 3,604
kW-mo/yr
Natural Gas $58,361 15,755
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,180 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,740

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.4226: Use / purchase optimum sized compressor $5,290 $900 $2,980
72,098
kWh
$2,310
-
kW-mo/yr
- - - -
02 2.7124: Make a practice of turning off lights when not needed $2,380 $600 $1,980
48,066
kWh
$130
-
kW-mo/yr
- - - $270
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,010 $330 $1,130
27,257
kWh
$880
-
kW-mo/yr
- - - -
04 2.1113: Reduce combustion air flow to optimum $1,730 - - - - $1,730
-
MMBtu
- -
05 2.3212: Optimize plant power factor $980 $1,650 - - $980 - - -
06 2.2437: Recover waste heat from equipment $900 $2,400 - - - $900
-
MMBtu
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $650 $830 $370
8,792
kWh
$280
-
kW-mo/yr
- - - -
08 3.4111: Use closed cycle process to minimize waste water production $6,680 $2,150 $(-120.0)
(-2,638)
kWh
$(-80.0)
-
kW-mo/yr
- - $6,880
-
Tgal
-
09 3.4151: Minimize water usage $1,560 $2,025 - - - - $1,560
-
Tgal
-
TOTAL RECOMMENDED $22,180 $10,885 $6,340
153,575
kWh
$3,520
-
kW-mo/yr
$980 $2,630
-
MMBtu
$8,440
-
Tgal
$270
TOTAL IMPLEMENTED $3,740 $330 $1,130
27,257
kWh
$880
-
kW-mo/yr
- $1,730
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs