ITAC Assessment: NV0009
ITAC logo
ITAC Assessment: NV0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Plastic Cups
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 160
Plant Area 300,000
ft2
Annual Production 1,300,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $534,615 8,529,015
kWh
Natural Gas $10,085 2,336
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,624 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,969

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,106 $1,200 $21,106
336,753
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $1,838 $100 $1,838
29,308
kWh
-
03 2.2524: Avoid cooling of process streams or materials that must subsequently be heated $13,655 $5,000 $13,655
217,761
kWh
-
04 2.4133: Use most efficient type of electric motors $20,542 $25,047 $20,542
328,546
kWh
-
05 2.7243: Improve air circulation with destratification fans / other methods $1,646 $2,200 - $1,646
-
MMBtu
06 2.7135: Install occupancy sensors $2,237 $80 $2,237
35,756
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $7,600 - $7,600
120,750
kWh
-
TOTAL RECOMMENDED $68,624 $33,627 $66,978
1,068,874
kWh
$1,646
-
MMBtu
TOTAL IMPLEMENTED $54,969 $28,627 $53,323
851,113
kWh
$1,646
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs